Kamal, S.

Improving labour productivity through low cost working platform - Vol.28(2), Apr-Jun - Pune NICMAR 2013 - 43-52p.

In general, the construction of building starts from the substructure and it is observed that the productivity of a construction labour gets lower when the work progresses at about 5 feet level from the floor level. In this case, the worker needs to work on temporary scaffolding where the materials have to be shifted from floor level to the required elevation along with construction equipment. Works at height lead the labourers to a disturbed mindset about their safety and belongings which directly affect the productivity in quality and quantity. To avoid such unnecessary situations, a structurally rigid working platform is required which could reduce the construction cost. An innovative instrument is required which would fulfill all the following terms and conditions: l It should be more economical than other options like scaffolding l Structurally rigid l Sufficient for material storage to ensure continuation of the work l Should have enough space to keep the construction tools and minor equipment l Should be portable By analyzing all the above conditions, a working table was designed for this study and was utilized in various construction activities. Results of the study reveal significant changes.


Construction Engineering and Management (CEM)
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha