000 -LEADER |
fixed length control field |
a |
003 - CONTROL NUMBER IDENTIFIER |
control field |
OSt |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20191202135911.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
191202b xxu||||| |||| 00| 0 eng d |
040 ## - CATALOGING SOURCE |
Original cataloging agency |
AIKTC-KRRC |
Transcribing agency |
AIKTC-KRRC |
100 ## - MAIN ENTRY--PERSONAL NAME |
9 (RLIN) |
10914 |
Author |
Deshpande, P. M. |
245 ## - TITLE STATEMENT |
Title |
Study Of Cost Estimation Model For Plant Equipment |
Remainder of title |
:A Case Study Of Water Treatment Plant |
250 ## - EDITION STATEMENT |
Volume, Issue number |
Vol.34(2), April-June |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Pune |
Name of publisher, distributor, etc. |
NICMAR |
Year |
2019 |
300 ## - PHYSICAL DESCRIPTION |
Pagination |
53-60p. |
520 ## - SUMMARY, ETC. |
Summary, etc. |
In engineering project environment, cost estimation is required for different phases in project cycle for feasibility, detailed project report, tender bidding and contracting. The cost estimate is the most needed to take the decisions. A viable estimate should also be produced with consistent definitions and a repeatable estimating process is a need ofengineering project cost estimation. This cost estimation should satisfy effort/cost, time schedule, risk and needs to be reliable. In engineering projects, the cost ofplant and machinery is a major cost and varies from 40 to 65 percent oftotal project cost depending on the technology, automation and type ofproject. The parametric cost estimation model is the solution to satisfy the different needs ofestimation. The parametric model for cost estimation based on equipment sizing and specification is an effective approach for cost estimation. The size ofequipment is the result ofthe capacity ofplant and this helps in estimating project cost for different plant capacities. Secondly, the engineering design information details are time dependent in project cycle; however, the estimation needs to be fairly accurate. The cost estimation based on parametric model is a solution for repetitive estimation in various project stages. This paper elaborates the principle and application ofparametric model with the case study ofwater treatment plant. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
9 (RLIN) |
4690 |
Topical term or geographic name entry element |
Construction Engineering and Management (CEM) |
773 0# - HOST ITEM ENTRY |
Place, publisher, and date of publication |
Pune National Institute of Construction Management and Research(NICMAR) |
International Standard Serial Number |
0970-3675 |
Title |
NICMAR Journal of construction management |
856 ## - ELECTRONIC LOCATION AND ACCESS |
URL |
https://www.nicmar.ac.in/pdf/2019/02April-June-2019.pdf |
Link text |
Click here |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
|
Koha item type |
Articles Abstract Database |