Scheduling, Material Requirement Plan (MRP) And Cash Outflow Analysis (Record no. 10392)

000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20191203095930.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 191203b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 10925
Author Mehendale, Rohit J.
245 ## - TITLE STATEMENT
Title Scheduling, Material Requirement Plan (MRP) And Cash Outflow Analysis
Remainder of title :A Case Study
250 ## - EDITION STATEMENT
Volume, Issue number Vol.34(3), Jyul-Sep
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Pune
Name of publisher, distributor, etc. NICMAR
Year 2019
300 ## - PHYSICAL DESCRIPTION
Pagination 5-12p.
520 ## - SUMMARY, ETC.
Summary, etc. Scheduling, Material Requirement Plan (MRP) and cash outflow analysis are some ofthe major elements which need to work out in a construction project. Generally, different softwares are available for each ofthis task. When there is a delay in the planned schedule, it is time consuming to get MRP and cash outflow plan updated according to the revised schedule. An ongoing Residential cum Commercial project located at Nasik has been taken up for the present case study. Microsoft Project software for Scheduling and Microsoft Excel software for MRP and cash outflow analysis have been adopted in the present study. As both the softwares are made by Microsoft, they have a built-in feature to interlink with each other. It is found when there is a delay in an activity; the schedule gets automatically updated by changing the starting date ofthe delayed activity. It is also found that it is easier to get the MRP and cash outflow to get updated according to the revised schedule
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4690
Topical term or geographic name entry element Construction Engineering and Management (CEM)
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 10926
Co-Author Patil, Aniket S.
773 0# - HOST ITEM ENTRY
International Standard Serial Number 0970-3675
Place, publisher, and date of publication Pune National Institute of Construction Management and Research(NICMAR)
Title NICMAR Journal of construction management
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://www.nicmar.ac.in/pdf/2019/03July-Sept-2019.pdf
Link text Click here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Barcode Date last seen Price effective from Koha item type
          School of Engineering & Technology (PG) School of Engineering & Technology (PG) Archieval Section 2019-12-03 2020357 2019-12-03 2019-12-03 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha