Analysis Of Time-Space Float For A Building Construction Project (Record no. 10402)

000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20191203142420.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 191203b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 10942
Author Hirpara, Ankit
245 ## - TITLE STATEMENT
Title Analysis Of Time-Space Float For A Building Construction Project
250 ## - EDITION STATEMENT
Volume, Issue number Vol.34(1), Jan-Mar
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Pune
Name of publisher, distributor, etc. NICMAR
Year 2019
300 ## - PHYSICAL DESCRIPTION
Pagination 5-11p.
520 ## - SUMMARY, ETC.
Summary, etc. The uniqueness of the project and high level of uncertainty associated with construction project makes its scheduling more challenging tasks resulting in the duration ofactivities overestimated. Hence Critical Chain Project Management Method (CCPM) acts as a handy tool to schedule the project with appropriate duration for each of the activities and providing various buffers to take into account various types ofuncertainties that may delay or create overrun for the activities. In conventional scheduling, space or location ofthe activity is not taken into account except in the case of techniques like Linear Scheduling Method (LSM), Line of Balance (LOB) method. The study is carried out to determine the project duration ofan ongoing project taking into account the actual duration ofactivities with constraints in resources and space available. The study compares the CCPM schedule taking into account the constraints in space with regular CCPM schedule and CPM schedule. The comparison shows that the duration of the project to complete with CCPM with space constraints, conventional CCPM, and CPM works out to 904 days, 854 days and 471 days respectively. On site verification ofthe project revealed that the project is expected to complete in 930 days, which is closer to CCPM with space constraints.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4690
Topical term or geographic name entry element Construction Engineering and Management (CEM)
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 10943
Co-Author Cardoz, Hazel
773 0# - HOST ITEM ENTRY
Title NICMAR Journal of construction management
International Standard Serial Number 0970-3675
Place, publisher, and date of publication Pune National Institute of Construction Management and Research(NICMAR)
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://www.nicmar.ac.in/pdf/2019/01Jan-March-2019.pdf
Link text Click here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Barcode Date last seen Price effective from Koha item type
          School of Engineering & Technology (PG) School of Engineering & Technology (PG) Archieval Section 2019-12-03 2020367 2019-12-03 2019-12-03 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha