000 -LEADER |
fixed length control field |
a |
003 - CONTROL NUMBER IDENTIFIER |
control field |
OSt |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20200919151413.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
200919b xxu||||| |||| 00| 0 eng d |
040 ## - CATALOGING SOURCE |
Original cataloging agency |
AIKTC-KRRC |
Transcribing agency |
AIKTC-KRRC |
100 ## - MAIN ENTRY--PERSONAL NAME |
9 (RLIN) |
6372 |
Author |
Subramanian, N. |
245 ## - TITLE STATEMENT |
Title |
Lessons Learnt from the Collapse of Footbridge in Miami, USA |
250 ## - EDITION STATEMENT |
Volume, Issue number |
Vol.94(3), March |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Thane |
Name of publisher, distributor, etc. |
ACC LTD |
Year |
2020 |
300 ## - PHYSICAL DESCRIPTION |
Pagination |
61-68p. |
520 ## - SUMMARY, ETC. |
Summary, etc. |
On March 15, 2018, a prestressed concrete truss footbridge in Miami, Florida, USA collapsed during construction. This bridge was designed as a ‘signature’ bridge with an unorthodox, non-redundant prestressed concrete truss bridge that was made to look like a cable-stayed bridge just for aesthetic appearance. The collapse of this footbridge caused several casualties and raised serious concerns about the design and construction of the bridge, in addition to the use of accelerated bridge construction (ABC). Recently the National Transportation Safety Board (NTSB), after conducting extensive investigations, released a report that attributed the collapse to flawed design, especially not providing enough shear transfer mechanism at the cold joint at the northern end of the bridge, and not considering the behaviour of the footbridge during all the construction stages. It also blamed all the involved agencies for their negligence of not proof checking the bridge design during all the construction stages. In addition it criticized the agencies for not considering the cracks (which were noticed near cold joints during the erection) as serious and life threatening even when the cracks were widening and subsequently lead to the collapse. As the failure of this bridge gives important lessons for bridge engineers, the features of the bridge and the reasons for its failure are described briefly. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
9 (RLIN) |
4621 |
Topical term or geographic name entry element |
Civil Engineering |
773 0# - HOST ITEM ENTRY |
Place, publisher, and date of publication |
Thane ACC Limited |
Record control number |
icj |
Title |
Indian Concrete Journal |
856 ## - ELECTRONIC LOCATION AND ACCESS |
URL |
https://www.icjonline.com/editionabstract_detail/032020 |
Link text |
Click here |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
|
Koha item type |
Articles Abstract Database |