Development of Multi-Objective Scheduling Model for Construction Projects Using Opposition-Based NSGA III (Record no. 15122)

000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20210901102543.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 210901b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 14161
Author Sharma, Kamal
245 ## - TITLE STATEMENT
Title Development of Multi-Objective Scheduling Model for Construction Projects Using Opposition-Based NSGA III
250 ## - EDITION STATEMENT
Volume, Issue number Vol.102(2), June
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. New York
Name of publisher, distributor, etc. Springer
Year 2021
300 ## - PHYSICAL DESCRIPTION
Pagination 421-434p.
520 ## - SUMMARY, ETC.
Summary, etc. With the aim of successfully completing the construction projects, several multi-objective scheduling models (MOSMs) have been systematically developed so far. In order to alleviate the limitations of existing MOSMs, in this paper, a multi-objective scheduling model is developed as an opposition-based non-dominated sorting genetic algorithm III (OBNSGA III). The developed model employs opposition-based learning technique in NSGA III that uses opposition numbers to generate the well diverse initial population and for generation jumping. The working efficiency of developed model is demonstrated through solving a time–cost-resources-quality trade-off optimization problem of a case study project that provides a set of Pareto-optimal solutions. The paper considers that each activity has several execution modes, which are accompanied by different amount of time, cost, resources and impact on entire project quality. Based on the performance metrics, hypothesis testing and results of developed model, the comparison between developed model and those reported in literature demonstrates the usefulness of developed model in simultaneous optimization of four objectives. Besides, outcomes of the proposed model, a value path plot to visualize more than three objectives, and a priori approach to select one solution from obtained Pareto-optimal solutions makes this paper useful to researchers and construction managers.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4621
Topical term or geographic name entry element Civil Engineering
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 14162
Co-Author Trivedi, M. K.
773 0# - HOST ITEM ENTRY
Place, publisher, and date of publication Switzerland Springer
International Standard Serial Number 2250-2149
Title Journal of the institution of engineers (India): Series A
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://link.springer.com/article/10.1007/s40030-021-00529-w
Link text Click here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Barcode Date last seen Price effective from Koha item type
          School of Engineering & Technology (PG) School of Engineering & Technology (PG) Archieval Section 2021-09-01 2021-2022046 2021-09-01 2021-09-01 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha