Delay in Rural Road Construction: Evidence from Pradhan Mantri Gram Sadak Yojana in Shimoga District, Karnataka, India (Record no. 15188)

000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20210920101251.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 210920b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 14239
Author Suresha, S. N.
245 ## - TITLE STATEMENT
Title Delay in Rural Road Construction: Evidence from Pradhan Mantri Gram Sadak Yojana in Shimoga District, Karnataka, India
250 ## - EDITION STATEMENT
Volume, Issue number Vol.102(1), March
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. New York
Name of publisher, distributor, etc. Springer
Year 2021
300 ## - PHYSICAL DESCRIPTION
Pagination 121-136p.
520 ## - SUMMARY, ETC.
Summary, etc. Rural roads are the basic infrastructure required for the improvements of rural areas. Rural roads had been planned and constructed under various rural development programs by the Government of India. However, serious efforts through these programs could not make road connectivity for more than 50% of rural areas in India. Hence, the Government of India had launched a major programme known as Pradhan Mantri Gram Sadak Yojana (PMGSY) on December 25, 2000. The PMGSY programme emphasizes on time and quality of construction. This paper reports an investigation on the delay in the construction of PMGSY roads in Shimoga district, Karnataka, India. Using the real-time data of PMGSY roads available on the Online Management Monitoring and Accounting System, an analysis was made to find the delay occurrence in the construction projects of the study area and the effect of various parameters with respect to delay. The study reveals that 95% of the PMGSY road projects have not been completed within the stipulated time and the road length, construction type, and seasons do not affect delay in construction. The present study helps the policy makers to implement reliable polices on rural road programs in the future.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4621
Topical term or geographic name entry element Civil Engineering
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 14240
Co-Author Arun, V.
773 0# - HOST ITEM ENTRY
Place, publisher, and date of publication Switzerland Springer
Title Journal of the institution of engineers (India): Series A
International Standard Serial Number 2250-2149
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://link.springer.com/article/10.1007/s40030-021-00509-0
Link text Click here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Barcode Date last seen Price effective from Koha item type
          School of Engineering & Technology (PG) School of Engineering & Technology (PG) Archieval Section 2021-09-20 2021-2022071 2021-09-20 2021-09-20 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha