Current Scenario of Documentation in Construction Sector of Surat Region (Record no. 15291)

000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20211012155634.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 210929b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 14386
Author Poriya, D.
245 ## - TITLE STATEMENT
Title Current Scenario of Documentation in Construction Sector of Surat Region
250 ## - EDITION STATEMENT
Volume, Issue number Vol, 102(3) September
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Germany
Name of publisher, distributor, etc. Springer
Year 2021
300 ## - PHYSICAL DESCRIPTION
Pagination 687-695p
520 ## - SUMMARY, ETC.
Summary, etc. Rapid growth of construction industry brings innovation and complexity in construction project. As we all know, there are numerous numbers of stakeholders are associated in single project including designers, engineers, contractor and daily workers. Single construction project creates tremendous number of documents throughout its life. Management of these documents has become essential as it has a great potential to overcome against time and cost overruns. Proper documentation helps project manager at the time of disputes between stakeholders. This paper depicts the current situation of documentation in Surat with current method used by construction person. As paper proceed, it shows various category of documents managed by construction persons on current project. Also, WhatsApp and e-mail are mainly used for document transfer to various stakeholders, engineers and contractor. Disputes between stakeholders is derived the top most issue due to improper documentation from Relative Importance Index calculation. Based on output of spearman correlation, disputes between stakeholders and miscommunication between team members are highly correlated with each other. Further spearman rank correlation shows that there is highly agreement between responses on project manager and PMC owner.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4621
Topical term or geographic name entry element Civil Engineering
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 14387
Co-Author Shah, Jigar
773 0# - HOST ITEM ENTRY
Place, publisher, and date of publication Switzerland Springer
Title Journal of the institution of engineers (India): Series A
International Standard Serial Number 2250-2149
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://link.springer.com/article/10.1007/s40030-021-00531-2
Link text Click Here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Barcode Date last seen Price effective from Koha item type
          School of Engineering & Technology (PG) School of Engineering & Technology (PG) Archieval Section 2021-10-12 2021-2022210 2021-10-12 2021-10-12 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha