Evaluation of Key Performance Indicators of Integrated Project Delivery and BIM Model for Infrastructure Transportation Project in Ahmedabad, India through Decision-Making Approach (Record no. 15700)

000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20211222160741.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 211222b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 14985
Author Bapat, Hirakraj
245 ## - TITLE STATEMENT
Title Evaluation of Key Performance Indicators of Integrated Project Delivery and BIM Model for Infrastructure Transportation Project in Ahmedabad, India through Decision-Making Approach
250 ## - EDITION STATEMENT
Volume, Issue number Vol, 102(4), December
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. USA
Name of publisher, distributor, etc. Springer
300 ## - PHYSICAL DESCRIPTION
Pagination 995-1011p.
520 ## - SUMMARY, ETC.
Summary, etc. Building Information Modeling (BIM) and Integrated Project Delivery (IPD) are widely adopted by the Architecture Engineering and Construction industry because of its distinguished benefits to the complex infrastructure projects throughout the project life cycle. This paper aims at evaluating Key Performance Indicators (KPI) of Integrated Project Delivery and Building Information Modeling for an infrastructure project like a metro-rail construction project in Ahmedabad, a city in western India, through decision-making tools like Factor Comparison Method (FCM) and fuzzy Decision-Making Trial and Evaluation Laboratory (DEMATEL). After an extensive literature review and experts’ opinions, a list of 24 Key Performance Indicators were generated. FCM and fuzzy DEMATEL were applied for prioritizing and evaluating the identified KPIs and disclosing their interrelationships based on influential weight. The findings revealed that 16 most critical key performance indicators are vital for BIM and IPD adoption in highly complex infrastructure projects with visualizing their interrelationship by causal diagram showing cause-and-effects groups. The results showed the four most influential and critical KPIs as accessibility and accuracy of information by BIM, facilitating access to real-time data, interoperability and compatibility of data, minimizing claims and disputes which should be given more consideration for enhanced performance and successful completion of the complex infrastructure projects in the future.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4621
Topical term or geographic name entry element Civil Engineering
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 9632
Co-Author Sarkar, Debasis
773 0# - HOST ITEM ENTRY
Title Journal of the institution of engineers (India): Series A
International Standard Serial Number 2250-2149
Place, publisher, and date of publication Switzerland Springer
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://link.springer.com/article/10.1007/s40030-021-00568-3
Link text Click here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Barcode Date last seen Price effective from Koha item type
          School of Engineering & Technology (PG) School of Engineering & Technology (PG) Archieval Section 2021-12-22 2021-2022520 2021-12-22 2021-12-22 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha