000 -LEADER |
fixed length control field |
a |
003 - CONTROL NUMBER IDENTIFIER |
control field |
OSt |
005 - DATE AND TIME OF LATEST TRANSACTION |
control field |
20240627144440.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
fixed length control field |
240627b xxu||||| |||| 00| 0 eng d |
040 ## - CATALOGING SOURCE |
Original cataloging agency |
AIKTC-KRRC |
Transcribing agency |
AIKTC-KRRC |
100 ## - MAIN ENTRY--PERSONAL NAME |
9 (RLIN) |
23812 |
Author |
Kuppuswamy, Ananthanarayanan |
245 ## - TITLE STATEMENT |
Title |
Improving efficiency of supply chain in construction projects through proper logistics |
250 ## - EDITION STATEMENT |
Volume, Issue number |
Vol.26(3), Jul-Sep |
260 ## - PUBLICATION, DISTRIBUTION, ETC. |
Place of publication, distribution, etc. |
Pune |
Name of publisher, distributor, etc. |
NICMAR |
Year |
2011 |
300 ## - PHYSICAL DESCRIPTION |
Pagination |
5-14p. |
520 ## - SUMMARY, ETC. |
Summary, etc. |
Supply chain management in a construction management context aims at the integration of various processes like, materials procurement, warehousing, distribution and logistics used within and outside the construction site. In order to reduce the operations cost, improving the inventory and customer satisfaction, it is necessary to use the principles of supply chain management. The main objectives of this study are: (i) To concentrate on the effect of logistics on the supply chain within the construction site, (ii) To find the optimum position of the temporary facilities in order to minimize the travel time, and (iii) To develop a software model to obtain the solution for the logistics problem within the construction site. The coordinates of the permanent structures and the required storage capacity of the temporary structures are the major inputs. The program draws the optimal road networks between the temporary and permanent structures for the vehicle movement. The scope of this study is limited to the supply chain for the construction industry and more specifically to the airport construction projects. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
9 (RLIN) |
4690 |
Topical term or geographic name entry element |
Construction Engineering and Management (CEM) |
700 ## - ADDED ENTRY--PERSONAL NAME |
9 (RLIN) |
23813 |
Co-Author |
Goyal, Manish |
773 0# - HOST ITEM ENTRY |
International Standard Serial Number |
0970-3675 |
Place, publisher, and date of publication |
Pune National Institute of Construction Management and Research(NICMAR) |
Title |
NICMAR Journal of construction management |
856 ## - ELECTRONIC LOCATION AND ACCESS |
URL |
https://publications.nicmar.ac.in/user/publication/viewissues/23 |
Link text |
Click here |
942 ## - ADDED ENTRY ELEMENTS (KOHA) |
Source of classification or shelving scheme |
|
Koha item type |
Articles Abstract Database |