Price adjustment clauses of the construction projects (Record no. 21241)

000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240627154654.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240627b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 23827
Author Agarwal, A. L.
245 ## - TITLE STATEMENT
Title Price adjustment clauses of the construction projects
250 ## - EDITION STATEMENT
Volume, Issue number Vol.26(3), Jul-Sep
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Pune
Name of publisher, distributor, etc. NICMAR
Year 2011
300 ## - PHYSICAL DESCRIPTION
Pagination 35-45p.
520 ## - SUMMARY, ETC.
Summary, etc. The biggest driver of Indian economy is the infrastructure sector. To strengthen the infrastructure the investments in the 12th plan are expected to be roughly double the investments in the 11th plan. The quantum of construction works has increased multifold that has to be completed in a short span of time, inviting a lot of complexities, uncertainties, risks and unforeseen problems during executions. A major chunk of these risks are mainly due to sudden variations in the price of various resources used during the course of construction project. Rates of Cement, Steel and POL (Petrol, Oil and Lubricant) are varying frequently. Hence it needs compensation to avoid speculation in tender. Thus a price adjustment clause is used in the contract to protect the interest of both the contractor and the client. In this paper efforts are made to highlight the importance of price adjustment clause, escalations and its correlation with inflation. The various flaws in the current system of calculating price escalation have been cited, these have been then compared with clauses of various different countries and the differences have been pointed out. Finally a new system of calculating escalation has been conceptualized which entails all the major discrepancies in the present system.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4690
Topical term or geographic name entry element Construction Engineering and Management (CEM)
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 23828
Co-Author Naved Akram
773 0# - HOST ITEM ENTRY
International Standard Serial Number 0970-3675
Place, publisher, and date of publication Pune National Institute of Construction Management and Research(NICMAR)
Title NICMAR Journal of construction management
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://publications.nicmar.ac.in/user/publication/viewissues/23
Link text Click here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Barcode Date last seen Price effective from Koha item type
          School of Engineering & Technology (PG) School of Engineering & Technology (PG) Archieval Section 2024-06-27 2024-0788 2024-06-27 2024-06-27 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha