Factors Influencing Delay In Construction Projects (Record no. 21275)

000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240629144421.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240629b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 23937
Author Gavhale, Hitendra R.
245 ## - TITLE STATEMENT
Title Factors Influencing Delay In Construction Projects
Remainder of title : A Case Of Mumbai Metro Project
250 ## - EDITION STATEMENT
Volume, Issue number Vol.28(2), Apr-Jun
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Pune
Name of publisher, distributor, etc. NICMAR
Year 2013
300 ## - PHYSICAL DESCRIPTION
Pagination 17-32p.
520 ## - SUMMARY, ETC.
Summary, etc. Delays are attributed to various factors in construction projects. Objective of the research is to study specific schedule impact scenarios on a single project and derive lessons based on past delays. This work is an outcome of a research carried out for two years, i.e. 2010 to 2012. Mumbai Metro Rail Project (MMRP) is taken as case study and significant findings are recorded in this paper. The source of delay, cost of delay and methods to mitigate delays are studied. Many factors are found to influence delay which are quantified here with the help of Likert scale and Ranking Index (I). MMRP is a prestigious and most awaited 12 Km elevated corridor facility launched by Mumbai Metropolitian Regional Development Authority (MMRDA) connecting Versova - Andheri - Ghatkopar on the western suburban region of Mumbai and shall significantly contribute in reducing the travel time to 20 minutes instead of present one and half hour's commute on road between Andheri and Ghatkopar. Estimated at a total cost of 2400 crores with base duration of 22 months, the project faced a number of delays which resulted in five extensions at various stages and is expected to complete by 2014. This study includes delay associated with construction work of twelve station structures only which were originally estimated at a base cost of Rs 226.3 crores. The paper briefly discusses some significant observations as how some of the delays could have been reasonably predicted and claims mitigated. The study records the findings as lessons learned for future projects.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4690
Topical term or geographic name entry element Construction Engineering and Management (CEM)
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 23939
Co-Author Subramanyan, Hariharan
773 0# - HOST ITEM ENTRY
Place, publisher, and date of publication Pune National Institute of Construction Management and Research(NICMAR)
Title NICMAR Journal of construction management
International Standard Serial Number 0970-3675
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://publications.nicmar.ac.in/user/publication/viewissues/47
Link text Click here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Permanent Location Current Location Shelving location Date acquired Barcode Date last seen Price effective from Koha item type
          School of Engineering & Technology (PG) School of Engineering & Technology (PG) Archieval Section 2024-06-29 2024-0803 2024-06-29 2024-06-29 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha