Normal view MARC view ISBD view

Stability Analysis of Underground Tunnel for 2nd Perimeter Highway Construction Work in Incheon

By: Shin, Eun Chul.
Contributor(s): Park, Jeong Jun.
Publisher: New York Springer 2018Edition: Vol,48 (2), June.Description: 235-250p.Subject(s): Civil EngineeringOnline resources: Click Here In: Indian geotechnical journalSummary: Construction of underground tunnel for highway in the urban area is a challenge to overcome many problems such as subsidence of residential houses and commercial buildings, broken of utilities lines, and vibrating and noise due to rock blasting. This paper presents the analysis of stability of 5.6 km long underground tunnel both partially completed tunnel and planed tunnel section, and the cause of tunnel collapse due to sinkhole. Several methods applied to analyze the stability of tunnel by the monitoring the instrumented data; settlement of ground, ground water level, and lateral and vertical displacement of internal face of tunnel. Soil investigation was also conducted to identify the exact soil layer characteristics and strength of soil and rock, and stratification of soil ground. The rock core was obtained and evaluated for the specimens from the 50 m long horizontal pre-boring process. The numerical analysis was carried out for the stability of tunnel in terms of internal displacement of tunnel, shotcrete bending compressive stress, and rock bolt axial force. GPR survey was also conducted for detection of sinkhole along the route of underground highways.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode Item holds
Articles Abstract Database Articles Abstract Database School of Engineering & Technology
Archieval Section
Not for loan 2021-2021558
Total holds: 0

Construction of underground tunnel for highway in the urban area is a challenge to overcome many problems such as subsidence of residential houses and commercial buildings, broken of utilities lines, and vibrating and noise due to rock blasting. This paper presents the analysis of stability of 5.6 km long underground tunnel both partially completed tunnel and planed tunnel section, and the cause of tunnel collapse due to sinkhole. Several methods applied to analyze the stability of tunnel by the monitoring the instrumented data; settlement of ground, ground water level, and lateral and vertical displacement of internal face of tunnel. Soil investigation was also conducted to identify the exact soil layer characteristics and strength of soil and rock, and stratification of soil ground. The rock core was obtained and evaluated for the specimens from the 50 m long horizontal pre-boring process. The numerical analysis was carried out for the stability of tunnel in terms of internal displacement of tunnel, shotcrete bending compressive stress, and rock bolt axial force. GPR survey was also conducted for detection of sinkhole along the route of underground highways.

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha