Normal view MARC view ISBD view

Challenges to Quality Control in Bored Cast-In-Situ Piling in Growing Urban Environment

By: Karandikar, D. V.
Publisher: New York Springer 2018Edition: Vol,48 (2), June.Description: 360-379p.Subject(s): Civil EngineeringOnline resources: Click Here In: Indian geotechnical journalSummary: Extensive bored cast-in-situ piling work is being carried out in growing metropolitan and other large cities for foundations of multi-storeyed office and residential buildings, flyovers and for retaining deep excavations for basements. The roads are small, traffic is heavy, there are restrictions on timings for movement of construction machinery and with all these limitations, the owners/clients require speedy construction of piled foundations to come ‘above ground’ for superstructure construction. Geotechnical consultants and piling contractors face tremendous challenges in urban environment in ensuring quality in piling work. The challenges relate to all aspects of piling work such as pile-bore retention during boring, pile tip zone cleaning, deciding socket lengths in deep weathered rocks, meeting the pile termination criteria, concreting without interruptions etc. In case of shoring piles for basement excavations, installation of anchors adds to a further challenge since they would penetrate in adjoining plot. Micropiles are also being extensively used without regard to their inherent limitations in installation and load carrying capacity. These aspects are discussed in the presented paper.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode Item holds
Articles Abstract Database Articles Abstract Database School of Engineering & Technology
Archieval Section
Not for loan 2021-2021577
Total holds: 0

Extensive bored cast-in-situ piling work is being carried out in growing metropolitan and other large cities for foundations of multi-storeyed office and residential buildings, flyovers and for retaining deep excavations for basements. The roads are small, traffic is heavy, there are restrictions on timings for movement of construction machinery and with all these limitations, the owners/clients require speedy construction of piled foundations to come ‘above ground’ for superstructure construction. Geotechnical consultants and piling contractors face tremendous challenges in urban environment in ensuring quality in piling work. The challenges relate to all aspects of piling work such as pile-bore retention during boring, pile tip zone cleaning, deciding socket lengths in deep weathered rocks, meeting the pile termination criteria, concreting without interruptions etc. In case of shoring piles for basement excavations, installation of anchors adds to a further challenge since they would penetrate in adjoining plot. Micropiles are also being extensively used without regard to their inherent limitations in installation and load carrying capacity. These aspects are discussed in the presented paper.

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha