Normal view MARC view ISBD view

Case study on cost and time optimization in constrution using BIM

By: Magar Rajendra B [Guide].
Contributor(s): Yadav, Reeta Rambachan (17CEM18).
Publisher: New Panvel AIKTC, School of Engg. & Tech. 2022Description: 104p. | Binding- Hard Bound | 30*21.5 cm.Subject(s): Construction Engineering and Management (CEM)DDC classification: 624.072 Online resources: Click Here to Explore Digital Copy
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
Thesis & Dissertation Thesis & Dissertation School of Engineering & Technology (PG)
Reference Section
Circulation 624.072 MAG (Browse shelf) Available TE029
Total holds: 0
Browsing School of Engineering & Technology (PG) Shelves , Shelving location: Reference Section , Collection code: Circulation Close shelf browser
No cover image available
624.072 MAG Case study on cost and time optimization in constrution using BIM

There are no comments for this item.

Log in to your account to post a comment.
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha