Considering landowner participation in wind farm layout optimization
By: Chen, Le.
Contributor(s): MacDonald, Erin.
Publisher: New York ASME 2012Edition: Vol.134(8), Aug.Description: 1-6p.Subject(s): Mechanical EngineeringOnline resources: Click here In: Journal of mechanical designSummary: Current wind farm layout optimization research assumes a continuous piece of land is readily available and focuses on advancing optimization methods. In reality, projects rely on landowners’ permission for success. When a viable site is identified, local residents are approached for permission to build turbines on their land, typically in exchange for monetary compensation. Landowners play a crucial role in the development process, and some land parcels are more important to the success of project than others. This paper relaxes the assumption that a continuous piece of land is available, developing a novel approach that includes a model of landowner participation rates. A genetic algorithm (GA) is adopted to solve the nonlinear constrained optimization problem, minimizing cost and maximizing power output. The optimization results show that, given a projected participation rate, we can identify the most crucial plots prior to the negotiation process with landowners. This will ultimately increase the efficiency of wind farm development.Item type | Current location | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|
Articles Abstract Database | School of Engineering & Technology Archieval Section | Not for loan | 2024-0719 |
Current wind farm layout optimization research assumes a continuous piece of land is readily available and focuses on advancing optimization methods. In reality, projects rely on landowners’ permission for success. When a viable site is identified, local residents are approached for permission to build turbines on their land, typically in exchange for monetary compensation. Landowners play a crucial role in the development process, and some land parcels are more important to the success of project than others. This paper relaxes the assumption that a continuous piece of land is available, developing a novel approach that includes a model of landowner participation rates. A genetic algorithm (GA) is adopted to solve the nonlinear constrained optimization problem, minimizing cost and maximizing power output. The optimization results show that, given a projected participation rate, we can identify the most crucial plots prior to the negotiation process with landowners. This will ultimately increase the efficiency of wind farm development.
There are no comments for this item.