Normal view MARC view ISBD view

Productivity improvement scheduling through effective resource management

By: Kamal, S.
Contributor(s): Venkatesh, M. P.
Publisher: Pune NICMAR 2011Edition: Vol.26(4), Oct-Dec.Description: 45-58p.Subject(s): Construction Engineering and Management (CEM)Online resources: Click here In: NICMAR Journal of construction managementSummary: Repetitive construction projects are common in India. Several approaches have been practised for modelling repetitive construction projects towards optimizing scheduling and resource allocation. This paper presents the model that uses Program Evaluation Review Technique (PERT) method and the spread sheet to prepare optimum scheduling for an effective utilization of the man power on the basis of data obtained from Mass Housing Project (MHP) for repetitive activities in order to minimize the overall project duration in the construction projects. The data presented in this paper has been collected from small scale building construction promoters in Chennai. The model presented in this paper is a formulation that can be easily modified and implemented for any type of repetitive project problem. Thus the result of this model can be used to predict the overall duration of the project and plan for effective utilization of the resource.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode Item holds
Articles Abstract Database Articles Abstract Database School of Engineering & Technology (PG)
Archieval Section
Not for loan 2024-0795
Total holds: 0

Repetitive construction projects are common in India. Several approaches have been practised for modelling repetitive construction projects towards optimizing scheduling and resource allocation. This paper presents the model that uses Program Evaluation Review Technique (PERT) method and the spread sheet to prepare optimum scheduling for an effective utilization of the man power on the basis of data obtained from Mass Housing Project (MHP) for repetitive activities in order to minimize the overall project duration in the construction projects. The data presented in this paper has been collected from small scale building construction promoters in Chennai. The model presented in this paper is a formulation that can be easily modified and implemented for any type of repetitive project problem. Thus the result of this model can be used to predict the overall duration of the project and plan for effective utilization of the resource.

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha