Normal view MARC view ISBD view

Significance of construction method statement : a case study

By: Yadav, Smitha.
Contributor(s): Rekhra, Tarun.
Publisher: Pune NICMAR 2013Edition: Vol.28(1), Jan-Mar.Description: 67-76p.Subject(s): Construction Engineering and Management (CEM)Online resources: Click here In: NICMAR Journal of construction managementSummary: Majority of construction projects suffer time, cost and quality related issues and these have been attributed to inadequate knowledge and understanding of the project sequence in advance. The paper highlights this issue and expresses the need for proper preparedness on a project by choosing the right methodology and detailing the same in advance. The methodology chosen should be such that it represents a "best fit" in any given ground conditions and makes it easier for implementation, so that even a skilled worker could execute the same without the continuos involvement of a supervisor/ in- charge. The issue is elaborated by cases wherein on account of a method statement formulated before the bidding stage, a construction company could not only have an edge on time line but could also increase its probability of winning the bid.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode Item holds
Articles Abstract Database Articles Abstract Database School of Engineering & Technology (PG)
Archieval Section
Not for loan 2024-0798
Total holds: 0

Majority of construction projects suffer time, cost and quality related issues and these have been attributed to inadequate knowledge and understanding of the project sequence in advance. The paper highlights this issue and expresses the need for proper preparedness on a project by choosing the right methodology and detailing the same in advance. The methodology chosen should be such that it represents a "best fit" in any given ground conditions and makes it easier for implementation, so that even a skilled worker could execute the same without the continuos involvement of a supervisor/ in- charge. The issue is elaborated by cases wherein on account of a method statement formulated before the bidding stage, a construction company could not only have an edge on time line but could also increase its probability of winning the bid.

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha