Normal view MARC view ISBD view

Conceptual framework on the relationship between DBB selection criteria and project performance

By: Ghadamsi, Alaeddin.
Contributor(s): Braimah, Nuhu.
Publisher: Pune NICMAR 2015Edition: Vol.30(3), Jul-Sep.Description: 23-36p.Subject(s): Construction Engineering and Management (CEM)Online resources: Click here In: NICMAR Journal of construction managementSummary: Project performance (PP) is highly influenced by the type of construction procurement method (PM) used to deliver the project. By virtue of this relationship, project clients often seek to select the best method that will help achieve better project performance. Although a lot of studies have been done with a view to develope models/tools for aiding the selection process, there is very less research that has looked at PM's actual- influence on project performance. As a contribution in this regard, this paper reports on a conceptual framework that demonstrates the existence of this influence. The framework is developed based on an extensive review of literature. The review was carried out to determine the main criteria for selecting DBB procurement methods and project performance measurements. Twelve (12) procurement selection criteria commonly cited in the literature were identified. A review on how each of these criterion suits the use of DBB method was also carried out. The latter review was to facilitate ranking of each of the criterion on a rating scale for purposes of predicting the actual level of influence a particular procurement method exerts on performance of a project. Besides offering a deeper understanding of PM relationships with PP, the proposed conceptual framework forms a basis for the development of the quantitative model at subsequent stages of the on-going study.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode Item holds
Articles Abstract Database Articles Abstract Database School of Engineering & Technology (PG)
Archieval Section
Not for loan 2024-0896
Total holds: 0

Project performance (PP) is highly influenced by the type of construction procurement method (PM) used to deliver the project. By virtue of this relationship, project clients often seek to select the best method that will help achieve better project performance. Although a lot of studies have been done with a view to develope models/tools for aiding the selection process, there is very less research that has looked at PM's actual- influence on project performance. As a contribution in this regard, this paper reports on a conceptual framework that demonstrates the existence of this influence. The framework is developed based on an extensive review of literature. The review was carried out to determine the main criteria for selecting DBB procurement methods and project performance measurements. Twelve (12) procurement selection criteria commonly cited in the literature were identified. A review on how each of these criterion suits the use of DBB method was also carried out. The latter review was to facilitate ranking of each of the criterion on a rating scale for purposes of predicting the actual level of influence a particular procurement method exerts on performance of a project. Besides offering a deeper understanding of PM relationships with PP, the proposed conceptual framework forms a basis for the development of the quantitative model at subsequent stages of the on-going study.

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha