Construction of steel bridge in lieu of conventional PSC girder bridge across Tungabhadra River near Mantralaya on State Highway SH-13 of Karnataka connecting Andhra Pradesh

By: Jaiprasad, R.
Contributor(s): Chakravarty, Uptal.
Publisher: New Delhi Indian Road Congress 2014Edition: Vol42(2), Feb.Description: 79-86p.Subject(s): Construction Engineering and Management (CEM)Online resources: Click here In: New Delhi Indian Road CongressSummary: The high level prestressed concrete (PSC) bridge of 600 m length constructed across Tungabhadra River in 1944 washed away on 2nd October 2009 and the traffic got disrupted between Karnataka and Andhra Pradesh, especially the connectivity to the famous holy place of Sri Raghavendra Swamy Mutt, which is Andrha Pradesh. The bridge was damaged and 5 piers, including 16 decks, were washed out, and one pier was tilted. The flooding was so furious that the holy Mutt and its surroundings were flooded and submerged. The alternative to rehabilitation and new construction were examined, and finally the Technical Committee of Karnataka Road Development Corporation Limited (KRDCL), Government of Karnataka, decided to construct a new steel bridge at the same location, as the cost of rehabilitation was ....
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode Item holds
Articles Abstract Database Articles Abstract Database School of Engineering & Technology (PG)
Archieval Section
Not for loan 2024-0910
Total holds: 0

The high level prestressed concrete (PSC) bridge of 600 m length constructed across Tungabhadra River in 1944 washed away on 2nd October 2009 and the traffic got disrupted between Karnataka and Andhra Pradesh, especially the connectivity to the famous holy place of Sri Raghavendra Swamy Mutt, which is Andrha Pradesh. The bridge was damaged and 5 piers, including 16 decks, were washed out, and one pier was tilted. The flooding was so furious that the holy Mutt and its surroundings were flooded and submerged. The alternative to rehabilitation and new construction were examined, and finally the Technical Committee of Karnataka Road Development Corporation Limited (KRDCL), Government of Karnataka, decided to construct a new steel bridge at the same location, as the cost of rehabilitation was ....

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha