Steel-precast concrete compostie deck construction for a railway over bridge
By: Abraham, K. P.
Contributor(s): Sharma, R. C.
Publisher: New Delhi Indian Road Congress 2015Edition: Vol.76(4), Oct-Dec.Description: 205-212p.Subject(s): Construction Engineering and Management (CEM)Online resources: Click here In: Journal of the Indian roads congressSummary: Composite deck of structural steel with precast RCC slab is adopted for the superstructure of a railway over bridge (ROB) at Nand Nagri, Delhi, for the first time in India. Construction the site restriction and the requirements of faster construction.....Item type | Current location | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|
Articles Abstract Database | School of Engineering & Technology (PG) Archieval Section | Not for loan | 2024-1277 |
Total holds: 0
Composite deck of structural steel with precast RCC slab is adopted for the superstructure of a railway over bridge (ROB) at Nand Nagri, Delhi, for the first time in India. Construction the site restriction and the requirements of faster construction.....
There are no comments for this item.