Time cost tradeoff for fast-track project: A systematic statistical approach to compare with traditional concepts
By: Magar Rajendra B [Guide]
.
Contributor(s): Mubarak, Kazi Arbaz [Research Scholar]
.
Material type: 


Item type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
![]() |
School of Engineering & Technology (PG) Archieval Section | Reference | 624.072 MAG/MUB (Browse shelf) | Not For Loan | TE002 |
Total holds: 0
There are no comments for this item.