Normal view MARC view ISBD view

Investigation of the extraction of the casing for large diameter cast-in-place piles by vibratory huammers in clays

By: Dong, YiZhi.
Contributor(s): Chen, FuQuan | Chen, YeKai.
Publisher: New York Springer 2018Edition: Vol. 48(3), September.Description: 430-441p.Subject(s): Civil EngineeringOnline resources: Click here In: Indian geotechnical journalSummary: The Benoto cast-in-place piles are widely used in civil engineering for having the advantage of producing low vibration and noise. Therefore, more researches are needed to fully understand its mechanism. However, the researches on the mechanism of Benoto piles are only limited to the driving stage, the study of extraction stage of the steel casing is not comprehensive. In this paper, a three-dimensional numerical model was developed by Coupled Eulerian–Lagrangian method. The mechanism of high-frequency vibratory extraction of casing was studied in detail. The result indicates that the vibratory casing extraction process can be divided into two stages, namely the slow and fast extraction stage. During the vibratory casing extraction process, the soil displacement, stresses, void ratio and excess pore water pressure abruptly change in the soils around the casing bottom. Furthermore, the influence of vibratory hammers on vibratory casing extraction was investigated. The change in the excitation frequency and excitation force has effect on casing extraction speed and soil particle velocity, but hardly has any influence on soil displacement and stresses.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode Item holds
Articles Abstract Database Articles Abstract Database School of Engineering & Technology
Archieval Section
Not for loan 2018242
Total holds: 0

The Benoto cast-in-place piles are widely used in civil engineering for having the advantage of producing low vibration and noise. Therefore, more researches are needed to fully understand its mechanism. However, the researches on the mechanism of Benoto piles are only limited to the driving stage, the study of extraction stage of the steel casing is not comprehensive. In this paper, a three-dimensional numerical model was developed by Coupled Eulerian–Lagrangian method. The mechanism of high-frequency vibratory extraction of casing was studied in detail. The result indicates that the vibratory casing extraction process can be divided into two stages, namely the slow and fast extraction stage. During the vibratory casing extraction process, the soil displacement, stresses, void ratio and excess pore water pressure abruptly change in the soils around the casing bottom. Furthermore, the influence of vibratory hammers on vibratory casing extraction was investigated. The change in the excitation frequency and excitation force has effect on casing extraction speed and soil particle velocity, but hardly has any influence on soil displacement and stresses.

There are no comments for this item.

Log in to your account to post a comment.
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha