Synchronizing Quality Analysis of HVAC-HVDC Parallal Tie-Line for Synchronization of Hydro, Thermal and Nuclear Power Grid
By: Sahu, Pankaj Kumar.
Publisher: New Delhi STM Journals 2018Edition: Vol.8(1), Jan-Apr.Description: 48-58p.Subject(s): Electrical EngineeringOnline resources: Click here In: Trends in electrical engineering (TEE)Summary: This research work prove the synchronizing quality of HVAC-HVDC parallel tie-line is different in Hydro, Thermal and Nuclear Power Grid. The synchronizing quality of HVAC-HVDC parallel tie-line is superior in Thermal Power Grid as compare to the Hydro & Nuclear Power Grid. This project work is also proves the synchronizing quality of HVAC-HVDC parallel tie-line is superior in Nuclear Power Grid as compare to the Hydro Power Grid. The synchronizing quality of HVAC-HVDC parallel tie-line in Hydro, Thermal & Nuclear Power Grid is judged by the settling time of frequency & tie-line power deviation of power grid in case of ∆PL6 = 0.01 p.u. load change in power grid-1. In this research work synchronization of Hydro, Thermal & Nuclear Power Grid is done by HVAC-HVDC parallel tie-line with traditional integral controller.Item type | Current location | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|
Articles Abstract Database | School of Engineering & Technology Archieval Section | Not for loan | 2020071 |
This research work prove the synchronizing quality of HVAC-HVDC parallel tie-line is different in Hydro, Thermal and Nuclear Power Grid. The synchronizing quality of HVAC-HVDC parallel tie-line is superior in Thermal Power Grid as compare to the Hydro & Nuclear Power Grid. This project work is also proves the synchronizing quality of HVAC-HVDC parallel tie-line is superior in Nuclear Power Grid as compare to the Hydro Power Grid. The synchronizing quality of HVAC-HVDC parallel tie-line in Hydro, Thermal & Nuclear Power Grid is judged by the settling time of frequency & tie-line power deviation of power grid in case of ∆PL6 = 0.01 p.u. load change in power grid-1. In this research work synchronization of Hydro, Thermal & Nuclear Power Grid is done by HVAC-HVDC parallel tie-line with traditional integral controller.
There are no comments for this item.