245 _aReview on Two-Area Hydro-thermal Power System
250 _aVol.5(2), Jul-Dec
260 _aNew Delhi
_bJournals Pub
_c2019
300 _a30-40p.
520 _aIn a two-area system, there will be one automatic load frequency control (ALFC) loop for each control area. Practical aspects considered in this system are reheat turbine in thermal power plant and mechanical governor in hydro-power plant. Reheat turbine improves the efficiency of the system as it again utilizes the steam coming out from high pressure turbine (HP) to run the intermediate pressure (IP) turbine and low pressure (LP) turbine.
650 0 _94619
_aEXTC Engineering
773 0 _tInternational journals of power electronics controllers and converters