000 a
999 _c15704
_d15704
003 OSt
005 20211223102000.0
008 211223b xxu||||| |||| 00| 0 eng d
040 _aAIKTC-KRRC
_cAIKTC-KRRC
100 _914992
_aTaghizadeh, Katayoon
245 _aIdentifying the Most Important Rework Factors in Building Projects and Providing a Solution to Reduce Their Effects
250 _aVol, 102(4), December
260 _aUSA
_bSpringer
_c2021
300 _a1027-1043p.
520 _aRework in construction is inevitable. It has a direct impact on the cost and the time of the project. Therefore, finding the factors that lead to rework can help control the extra cost and time as well as preventing from design problems among architects, construction engineers, contractors and users. In this study, twenty factors that lead to rework have been extracted from previous research. After examining the output data from factor analysis, the factors affecting rework have been divided into four variable groups: Project management, Education, Changes and Interaction with the environment (Immersion). Lack of understanding of the project model by the designer, contractor and user is one of the direct consequences of “Changes,” “Education” and Interaction with the environment that affect rework. A virtual environment, using virtual reality, has been proposed on a one-to-one scale where the users can be immersed in the environment; this virtual model helps better understand the project at the design stage.
650 0 _94621
_aCivil Engineering
700 _914993
_aNoorzai, Esmatullah
773 0 _x 2250-2149
_tJournal of the institution of engineers (India): Series A
_dSwitzerland Springer
856 _uhttps://link.springer.com/article/10.1007/s40030-021-00570-9
_yClick here
942 _2ddc
_cAR