000 a
999 _c18088
_d18088
003 OSt
005 20221104114450.0
008 221104b xxu||||| |||| 00| 0 eng d
040 _aAIKTC-KRRC
_cAIKTC-KRRC
100 _918881
_aGeberemariam, Thewodros K.
245 _aPost construction green infrastructure performance monitoring parameters and their functional components
250 _aVol.19(1), Jan-Jun
260 _aNew Delhi
_bSerials Publications
_c2022
300 _a61-71-p.
520 _aDrainage system infrastructures in most urbanized cities have reached or exceeded their design life cycle and are characterized by running with inadequate capacity. These highly degraded infrastructures are already overwhelmed and continued to impose a significant challenge to the quality of water and ecological systems. With predicated urban growth and climate change the situation is only going to get worse. As a result, municipalities are increasingly considering the concept of retrofitting existing stormwater drainage systems with green infrastructure practices as the first and an important step t reduce stormwater runoff volume and pollutant load inputs into combined sewer systems (CSO) and wastewater facilities.
650 0 _94621
_aCivil Engineering
773 0 _dNew Delhi Serials Publications Pvt. Ltd.
_x0973-3574
_tInternational journal of environment and development
856 _uhttps://serialsjournals.com/index.php?route=product/editor&type=icvvalue&product_id=300
_yClick here
942 _2ddc
_cAR