245 _aStudy on the variation of vertical attitude deviation for long-distance jacking with an initial slope of super-large frame box culvert
250 _aVol.53(3), Jun
260 _aUSA
_bSpringer
_c2023
300 _a613-621p.
520 _aThis paper studies the influence of departure slope on the vertical attitude deviation of long-distance jacking for super-large frame box culverts. Closely combined with the engineering example of the overpass project for Tongling North Road under Hefei East Railway Station, the whole process evolution of the long-distance jacking attitude for the box culvert under different starting slopes and multiple working conditions is studied by using the numerical calculation method firstly. The numerical results show that in the process of long-distance jacking of super-large box culverts, the maximum lifting amount of box culverts on the whole increases with the increase in the initial slope, and it is beneficial to control the vertical attitude deviation of box culverts when the initial slope is flat. Finally, the rationality of the conclusion is verified by inverse analysis of monitoring data for the box culvert jacking project. The research results provide the theoretical basis for correctly understanding and reasonably judging the attitude control of long-distance jacking of super-large box culverts. At the same time, it is provided case support and the reference basis for similar engineering construction.
650 0 _94621
_aCivil Engineering
700 _921620
_aXia, Zhihua
773 0 _tIndian geotechnical journal
_dSwitzerland Springer
_x 0971-9555
856 _uhttps://link.springer.com/article/10.1007/s40098-022-00697-x
_yClick here
942 _2ddc
_cAR