000 | nam a22 7a 4500 | ||
---|---|---|---|
999 |
_c5380 _d5380 |
||
005 | 20181011090737.0 | ||
008 | 181010b xxu||||| |||| 00| 0 eng d | ||
040 | _cAIKTC-KRRC | ||
082 |
_2DDC23 _a624.072 _bMAG/MUB |
||
100 |
_94707 _aMagar Rajendra B. _eGuide |
||
245 | _aTime cost tradeoff for fast-track project: A systematic statistical approach to compare with traditional concepts | ||
260 |
_aNew Panvel _bAIKTC School of Engineering _c2016 |
||
300 |
_a75p. _bHard Bound |
||
650 | 0 |
_94690 _aConstruction Engineering and Management (CEM) |
|
650 | 0 |
_94708 _aThesis And Dissertation |
|
700 |
_94710 _aMubarak, Kazi Arbaz _eResearch Scholar |
||
942 |
_2ddc _cTHESIS |