000 | nam a22 7a 4500 | ||
---|---|---|---|
999 |
_c5384 _d5384 |
||
003 | OSt | ||
005 | 20181011091124.0 | ||
008 | 181011b xxu||||| |||| 00| 0 eng d | ||
040 | _cAIKTC-KRRC | ||
082 |
_2DDC23 _a624.072 _bMAG/KHA |
||
100 |
_94707 _aMagar Rajendra B. _eGuide |
||
245 | _aDecision making for selection of optimum machinery in mega construction projects using artificial intelligence techniques | ||
260 |
_aNew Panvel _bAIKTC School of Engineering _c2016 |
||
300 |
_a120p. _bHard Bound |
||
520 | _aSelection of machineries in construction projects is a central element in the planning phase of the life cycle of the project. Appropriately selected machineries are the lifeblood of any multistoried construction project and contribute largely to the efficient, timeliness, and profitability of the project. An error in selection can lead to large and unnecessary expenses arising from operational inadequacy or failure, and can produce an unsafe working environment which leads to undesirable expenses. It is assured that optimum selection of machineries lower the risk and costs associated with it. | ||
650 | 0 |
_94690 _aConstruction Engineering and Management (CEM) |
|
650 | 0 |
_94708 _aThesis And Dissertation |
|
700 |
_94714 _aKhan, Sakib Mohd. Dastagir (14CEM06) _eResearch Scholar |
||
856 |
_uhttp://www.aiktcdspace.org:8080/jspui/handle/123456789/2061 _zClick to access e-version |
||
942 |
_2ddc _cTHESIS |