000 a
999 _c8553
_d8553
001 icj
003 OSt
005 20190917122623.0
006 smr|p|r|||| 00| 0
008 190319b xxu||||| |||| 00| 0 eng d
040 _aAIKTC-KRRC
_cAIKTC-KRRC
100 _98118
_aWadhwa, Pranav
245 _aGeopolymer paste cured at ambient temperature through OPC addition
250 _aVol. 92(9), September
260 _aMaharashtra
_bACC LTD
_c2018
300 _a11-24p.
520 _aGeopolymer has a major drawback that, it requires high curing temperature to get substantial strength. This increases the energy consumption and limits the use of this material to pre-cast elements only. Arrangement for thermal curing on site is a cumbersome task.........
650 0 _94621
_aCivil Engineering
700 _98119
_aBhattacharjee, B.
773 0 _dThane ACC Limited
_tIndian concrete journal
942 _2ddc
_cAR