Critical Factors Impacting BIM Uptake In The Indian Built Environment Sector (Record no. 10393)

MARC details
000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250408122928.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 191203b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 10927
Author Malsane, Sagar
245 ## - TITLE STATEMENT
Title Critical Factors Impacting BIM Uptake In The Indian Built Environment Sector
250 ## - EDITION STATEMENT
Volume, Issue number Vol.34(3), Jul-Sep
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Pune
Name of publisher, distributor, etc. NICMAR
Year 2019
300 ## - PHYSICAL DESCRIPTION
Pagination 13-24p.
520 ## - SUMMARY, ETC.
Summary, etc. t is believed that the Indian AEC industry is lagging behind when it comes to building information modeling (BIM) adoption. Therefore, the purpose ofthis research is to establish a clear understanding ofthe present level ofawareness ofBIM. Furthermore, the study aims to identify significant BIM functions and barriers that might impact the BIM adoption rate. With the help ofa survey method, a questionnaire was distributed to the target sample of80 professionals out ofwhich 65 responded by completing the questionnaire. The researcher selected the sample using a convenience sampling technique. The responses were analyzed using the relative importance index (RII) method to draw the results. The results indicate the current status ofBIM awareness and reveal the factors that influence BIM adoption in the form of key BIM functions and barriers from the perspective ofprofessionals. Indian professionals working in the field oftechnology can use the results drawn in the form ofBIM key functions to provide more focused training about them, to ensure their successful diffusion. They can also work on eliminating the key barriers to boost the BIM uptake. Previous researches have essentially focused on finding out the BIM's presence in India. This research contributes primarily by examining, from the perspective ofprofessionals, and using the relative importance index (RII) method to identify the critical factors involved in BIM adoption. Establishing such critical factors is ofsignificant value as they can expedite or hinder BIM's adoption rate in India.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4690
Topical term or geographic name entry element Construction Engineering and Management (ME-CE)
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 10928
Co-Author Shrivas, Abhishek
773 0# - HOST ITEM ENTRY
International Standard Serial Number 0970-3675
Title NICMAR Journal of construction management
Place, publisher, and date of publication Pune National Institute of Construction Management and Research(NICMAR)
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://www.nicmar.ac.in/pdf/2019/03July-Sept-2019.pdf
Link text Click here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     School of Engineering & Technology (PG) School of Engineering & Technology (PG) Archieval Section 03/12/2019   2020358 03/12/2019 03/12/2019 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.