Controlled Blasting for Deconstruction of a Railway Bridge Near Sahibganj (Record no. 14648)

MARC details
000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20210315154157.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 210315b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 13669
Author Mandal, S. K.
245 ## - TITLE STATEMENT
Title Controlled Blasting for Deconstruction of a Railway Bridge Near Sahibganj
250 ## - EDITION STATEMENT
Volume, Issue number Vol,99(2), issue
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kolkata
Name of publisher, distributor, etc. Springer
Year 2018
300 ## - PHYSICAL DESCRIPTION
Pagination 359-367p
520 ## - SUMMARY, ETC.
Summary, etc. Some of the Indian Railway bridges require reconstruction for electrification and expansion of railway tracks. Dismantling of bridge within time schedule in densely populated area requires controlled and pre-planned blasting methodology for safe pulling down of the structure and quick removal of blasted debris for fast restoration of tracks and smooth plying of trains. The three arched railway bridge (Bridge No. 61) located between Sahibganj and Karamtola cases one such example where the bridge was dismantled and the track was restored within 4 h of blasting, though the stipulated block period for demolition and restoration of tracks was 6 h. The 25.48 m long three-arched bridge was drilled and blasted with 225 number of blastholes (32 mm diameter) and 100 kg explosive (25 mm diameter). Length of blastholes varied between 0.5 and 1.8 m with blast geometry of 0.3–0.35 m burden and 0.33 m spacing. This paper deals with the conceptual and theoretical model developed for identification of the key locations for drilling and implementation of the same. It also discusses about the precautionary measures and the drilling pattern adopted for quick demolition and speedy restoration of tracks.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4621
Topical term or geographic name entry element Civil Engineering
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 13670
Co-Author Ghosh, A. K.
773 0# - HOST ITEM ENTRY
Title Journal of the institution of engineers (India): Series A
Place, publisher, and date of publication Switzerland Springer
International Standard Serial Number 2250-2149
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://link.springer.com/article/10.1007/s40030-018-0268-9
Link text Click Here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     School of Engineering & Technology School of Engineering & Technology Archieval Section 15/03/2021   2021-2021708 15/03/2021 15/03/2021 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.