Construction delays in India: A review of shifting focus, mitigation, methodologies, and research gap (Record no. 19602)

MARC details
000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20230705123138.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 230705b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 21324
Author Saxena, Hardik
245 ## - TITLE STATEMENT
Title Construction delays in India: A review of shifting focus, mitigation, methodologies, and research gap
250 ## - EDITION STATEMENT
Volume, Issue number Vol.97(2), Feb
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Mumbai
Name of publisher, distributor, etc. ACC LTD
Year 2023
300 ## - PHYSICAL DESCRIPTION
Pagination 46-58p.
520 ## - SUMMARY, ETC.
Summary, etc. The demand for construction is increasing with the rise in population. It is necessary to check the construction performance and economy of the project in a developing nation. Delays in planning and execution are a proven challenge for the construction industry for a long time. It directly affects the construction performance and economy of the project. The earlier studies focusing on construction delays provide various evidence on causes, classification, and mitigation of delay factors. Even with all the evidence, construction projects in India continue to suffer from delays. The objective of this article is to examine the trends and focus of research on construction delays over the last two decades and identify the research gaps. The preferred reporting items for systematic reviews and metaanalyses (PRISMA) technique is used to assess the literature on construction delays. Classification and analysis of studies are carried out based on journal representation, year of publication, type, nature of the study, sector of study, and mitigation tools adopted. Finally, this paper suggests areas for future research focus based on the findings of the literature review to further address the issue of construction delays. The identified research gaps are sector-specific delay factors, the study of delay factors and their respective impact, the lack of standardization of building information modelling (BIM), and the impact of delays on the environment. The paper adds value by facilitating researchers to decide the focus area in delay studies and the scope for their future research not only from conceptual but also from methodological points of view.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 4621
Topical term or geographic name entry element Civil Engineering
700 ## - ADDED ENTRY--PERSONAL NAME
9 (RLIN) 9636
Co-Author Mittal, Yash Kumar
773 0# - HOST ITEM ENTRY
Title Indian Concrete Journal - ICJ
International Standard Serial Number 0019-4565
Place, publisher, and date of publication Thane ACC Limited
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://www.icjonline.com/editionabstract_detail/022023
Link text Click here
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     School of Engineering & Technology (PG) School of Engineering & Technology (PG) Archieval Section 05/07/2023   2023-0974 05/07/2023 05/07/2023 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.