Impact Of External Disruptions On Network Governance Of Construction Projects (Record no. 9165)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | a |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | OSt |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20230109122911.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 190531b xxu||||| |||| 00| 0 eng d |
| 040 ## - CATALOGING SOURCE | |
| Original cataloging agency | AIKTC-KRRC |
| Transcribing agency | AIKTC-KRRC |
| 100 ## - MAIN ENTRY--PERSONAL NAME | |
| 9 (RLIN) | 8983 |
| Author | Iyer, K. Chandrashekhar |
| 245 ## - TITLE STATEMENT | |
| Title | Impact Of External Disruptions On Network Governance Of Construction Projects |
| Remainder of title | :A Case Study Of Demonetisation And GST In India |
| 250 ## - EDITION STATEMENT | |
| Volume, Issue number | Vol. 33(3), July-Sep |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Pune |
| Name of publisher, distributor, etc. | NICMAR |
| Year | 2018 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Pagination | 5-16p. |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc. | The disruption of construction activities reflect in consequential delays and cost implications ofthe project. Demonetization and introduction ofGoods and Service Tax (GST) in India had led to events ofdisruption in Indian construction sector and the extent ofdisruption that these two events have caused is shown in this study. The relevant data were collected from 13 different construction and infrastructure projects ofan Indian construction firm, from different zones ofthe country to assess the impacts of disruption caused by these two events. The impact of each event was recorded separately on different governance networks considered for each project; namely Labour Flow Network (LFN), Material Flow Network (MFN), Information Flow Network (IFN) and Finance Flow Network (FFN) and weights assigned to each governance network based on the relative importance were used to compute and assess the overall impact on that project. This study showed that there was significant delay and cost impact due to GST and significant delay impact only, in the case of Demonetization. Also, the impacts of disruption caused by both Demonetization and GST were compared to conclude that the nature of impact of both the disruptions and events can be different. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| 9 (RLIN) | 4621 |
| Topical term or geographic name entry element | Civil Engineering |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| 9 (RLIN) | 8984 |
| Co-Author | Ubhayakar, Dheeraj K. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| 9 (RLIN) | 8985 |
| Co-Author | Banerjee, Partha S. |
| 773 0# - HOST ITEM ENTRY | |
| Place, publisher, and date of publication | Pune National Institute of Construction Management and Research(NICMAR) |
| International Standard Serial Number | 0970-3675 |
| Title | NICMAR Journal of construction management |
| 856 ## - ELECTRONIC LOCATION AND ACCESS | |
| URL | https://www.nicmar.ac.in/pdf/2018/03July-Sept-2018.pdf |
| Link text | Click here |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Source of classification or shelving scheme | Dewey Decimal Classification |
| Koha item type | Articles Abstract Database |
| Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Home library | Current library | Shelving location | Date acquired | Total Checkouts | Barcode | Date last seen | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Dewey Decimal Classification | School of Engineering & Technology | School of Engineering & Technology | Archieval Section | 31/05/2019 | 2018611 | 10/06/2019 | 31/05/2019 | Articles Abstract Database |