Publication details: Mumbai Indian Institute of Architects 2023Edition: Vol.88(3), MarDescription: 46-47pSubject(s): Online resources: In: Journal of the Indian institute of architects :(JIIA)Summary: The wealth arm (IIFLW) took over the entire building from the parent holding company IIFL. This gave an opportunity to redesign not only all the 10 floors but also put in additional infrastructure like a service Dumb Elevator and new chillers for air-conditioners at the terrace level. Skylights were created below terrace spaces and an entire slab in one grid (2nd Floor and 3rd Floor) was demolished to make way for an inter- connected floor.| Item type | Current library | Status | Barcode | |
|---|---|---|---|---|
Articles Abstract Database
|
School of Architecture Archieval Section | Not for loan | 2023-1026 |
Total holds: 0
The wealth arm (IIFLW) took over the
entire building from the parent holding
company IIFL. This gave an opportunity
to redesign not only all the 10 floors
but also put in additional infrastructure
like a service Dumb Elevator and new
chillers for air-conditioners at the terrace
level. Skylights were created below
terrace spaces and an entire slab in
one grid (2nd Floor and 3rd Floor) was
demolished to make way for an inter-
connected floor.