Methodology for Estimating the Cost of Delay in Architectural Engineering Projects: Case of Metro Rails in India

By: Contributor(s): Publication details: New York Springer 2019Edition: Vol.100(2), JuneDescription: 311-318pSubject(s): Online resources: In: Journal of the institution of engineers (India) Series ASummary: Development of a nation is directly related to the accomplishment of public infrastructure projects. They cater to the objectives of sector-specific demand and accrue benefits in other related fields. These architectural engineering projects contribute to the overall development, which is complex to measure in tangible terms alone, but call for establishing indicators for measuring intangible benefits as well. Delay in projects is considered to affect the tangible cost benefits. It is, however, a limited perception of delay consequences. The cost of delay (CoD), therefore, can be determined by considering the overall impact of tangible and intangible benefits of such projects. This paper brings out the framework for determining the CoD for the selected case study of a metro rail project. It reflects the consequences of delay in overall development prospects and high-level infrastructure objectives by establishing the CoD. The cost thus established can serve as the basis for mobilizing additional resources and strategic decision making in the best interest of overall benefits. The outcome of the study creates an opportunity to manage metro rail projects by mitigating the negative consequences of time overruns.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Status Barcode
Articles Abstract Database Articles Abstract Database School of Engineering & Technology Archieval Section Not for loan 2019729
Total holds: 0

Development of a nation is directly related to the accomplishment of public infrastructure projects. They cater to the objectives of sector-specific demand and accrue benefits in other related fields. These architectural engineering projects contribute to the overall development, which is complex to measure in tangible terms alone, but call for establishing indicators for measuring intangible benefits as well. Delay in projects is considered to affect the tangible cost benefits. It is, however, a limited perception of delay consequences. The cost of delay (CoD), therefore, can be determined by considering the overall impact of tangible and intangible benefits of such projects. This paper brings out the framework for determining the CoD for the selected case study of a metro rail project. It reflects the consequences of delay in overall development prospects and high-level infrastructure objectives by establishing the CoD. The cost thus established can serve as the basis for mobilizing additional resources and strategic decision making in the best interest of overall benefits. The outcome of the study creates an opportunity to manage metro rail projects by mitigating the negative consequences of time overruns.

There are no comments on this title.

to post a comment.

Click on an image to view it in the image viewer

Local cover image
Share
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.