Gore, Rahul

IIFLW - Vol.88(3), Mar - Mumbai Indian Institute of Architects 2023 - 46-47p.

The wealth arm (IIFLW) took over the
entire building from the parent holding
company IIFL. This gave an opportunity
to redesign not only all the 10 floors
but also put in additional infrastructure
like a service Dumb Elevator and new
chillers for air-conditioners at the terrace
level. Skylights were created below
terrace spaces and an entire slab in
one grid (2nd Floor and 3rd Floor) was
demolished to make way for an inter-
connected floor.


ARCHITECTURE GENERAL (AR-GEN)