| 000 | a | ||
|---|---|---|---|
| 999 | _c15082 _d15082 | ||
| 003 | OSt | ||
| 005 | 20210802124023.0 | ||
| 008 | 210802b xxu||||| |||| 00| 0 eng d | ||
| 040 | _aAIKTC-KRRC _cAIKTC-KRRC | ||
| 100 | _914109 _aSharvil Alex, Faroz | ||
| 245 | _aProactive time to first repair for coastal RC bridge with prescriptive durability provisions | ||
| 250 | _aVol.95(3), March | ||
| 260 | _aThane _bACC LTD _c2021 | ||
| 300 | _a58-64p. | ||
| 520 | _aPrescriptive durability provisions have been used worldwide for designing concrete structures. Such structures are found to have deteriorated prematurely (unpredicted and suddenly), requiring expensive repairs. In this paper a probabilistic life-cycle deterioration analysis is performed for an upcoming coastal reinforced concrete bridge in India to proactively estimate the time of its first repair. This information is of utmost importance, particularly to support bridge managers defining the budget allocations for maintenance scenarios. This analysis also highlights the inadequacy of the current prescriptive provisions and the importance of adopting the probabilistic durability design for new infrastructures in the future. | ||
| 650 | 0 | _94621 _aCivil Engineering | |
| 700 | _914110 _a Coelho, Mário | ||
| 773 | 0 | _tIndian Concrete Journal _dThane ACC Limited | |
| 856 | _uhttps://www.icjonline.com/editionabstract_detail/032021 _yClick here | ||
| 942 | _2ddc _cAR | ||