| 245 | _aPower system operation: issues and challenges | ||
| 250 | _aVol.15(2), Apr | ||
| 260 |
_aHyderabad _bIUP Publications _c2022 |
||
| 300 | _a59-70p. | ||
| 520 | _aPower system operation has become more complex with larger use of renewable energy sources, strict requirements of environmental controls, and need to maintain adequate security and stability norms. To meet the environmental norms now, Flue- Gas Desulphurization (FGD) plants have to be installed in old thermal power plants. With larger share of wind and solar energy resources, flexible operation of conventional thermal and hydro power plants is needed. The paper reviews various recent issues pertaining to power system operation in India and the challenges posed to ensure efficient grid operation. | ||
| 650 | 0 |
_94619 _aEXTC Engineering |
|
| 700 |
_917856 _aBalasubrahmanyam, P. V. |
||
| 773 | 0 |
_tIUP journal of electrical and electronics engineering _x0974-1704 _dHyderabad IUP Publications |
|
| 856 |
_uhttps://www.iupindia.in/0422/Electrical%20and%20Electronics%20Engineering/Power_System.asp _yClick here |
||
| 942 |
_2ddc _cAR |
||