Adidas east village extension- Team Work (Record no. 17180)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | a |
003 - CONTROL NUMBER IDENTIFIER | |
control field | OSt |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20220720152648.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 220720b xxu||||| |||| 00| 0 eng d |
040 ## - CATALOGING SOURCE | |
Original cataloging agency | AIKTC-KRRC |
Transcribing agency | AIKTC-KRRC |
100 ## - MAIN ENTRY--PERSONAL NAME | |
9 (RLIN) | 17348 |
Author | Testa, Caterina |
245 ## - TITLE STATEMENT | |
Title | Adidas east village extension- Team Work |
250 ## - EDITION STATEMENT | |
Volume, Issue number | Issue 139 - June |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Place of publication, distribution, etc. | Bologna |
Name of publisher, distributor, etc. | The Plan - Architecture & Technologies in Detail |
Year | 2022 |
300 ## - PHYSICAL DESCRIPTION | |
Pagination | 78-89p. |
520 ## - SUMMARY, ETC. | |
Summary, etc. | The North American headquarters of adidas, the multinational sports apparel company, is located north of downtown Portland, Oregon, along the eastern bank of the Willamette River, which flows through the city. Although essentially made up of two sections separated by a busy main road – Greeley Avenue – the campus forms a compact unit, joined by an elevated walkway across the thoroughfare. It fits comfortably into its urban setting, the segment to the west near the river surrounded by the dense vegetation lining the bank, while the eastern volume abuts onto a densely built quarter of detached family homes. One of the goals posited for the new campus extension was to further improve the way the whole adidas complex blends with the city by adding a new public access on its eastern side. This requirement led the architects to decide on two new volumes, the Gold Building and the Performance Zone Building, located at opposite ends of a large soccer field close to the residential district. The competition called by the client was swiftly concluded, with Lever Architecture winning the brief along with the firms Studio O+A and GGN. The budget and delivery date specifications were particularly challenging: adidas required a construction whose architecture reflected its corporate culture and commitment to quality, authenticity and innovation but which had to be completed within 24 months. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
9 (RLIN) | 71 |
Topical term or geographic name entry element | ARCHITECTURE GENERAL (AR-GEN) |
773 0# - HOST ITEM ENTRY | |
Place, publisher, and date of publication | Bologna, Italy The Plan - Architecture & Technologies in Detail |
International Standard Book Number | 2499-6602 |
Title | Plan |
856 ## - ELECTRONIC LOCATION AND ACCESS | |
URL | https://www.theplan.it/eng/magazine/2022/the-plan-139-06-2022/adidas-east-village-extension |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Source of classification or shelving scheme | |
Koha item type | Articles Abstract Database |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Permanent Location | Current Location | Shelving location | Date acquired | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Reference | School of Architecture | School of Architecture | Archieval Section | 2022-07-20 | 2022-1193 | 2022-07-20 | 2022-07-20 | Articles Abstract Database |