Adidas east village extension- Team Work (Record no. 17180)

000 -LEADER
fixed length control field a
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20220720152648.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 220720b xxu||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency AIKTC-KRRC
Transcribing agency AIKTC-KRRC
100 ## - MAIN ENTRY--PERSONAL NAME
9 (RLIN) 17348
Author Testa, Caterina
245 ## - TITLE STATEMENT
Title Adidas east village extension- Team Work
250 ## - EDITION STATEMENT
Volume, Issue number Issue 139 - June
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Bologna
Name of publisher, distributor, etc. The Plan - Architecture & Technologies in Detail
Year 2022
300 ## - PHYSICAL DESCRIPTION
Pagination 78-89p.
520 ## - SUMMARY, ETC.
Summary, etc. The North American headquarters of adidas, the multinational sports apparel company, is located north of downtown Portland, Oregon, along the eastern bank of the Willamette River, which flows through the city. Although essentially made up of two sections separated by a busy main road – Greeley Avenue – the campus forms a compact unit, joined by an elevated walkway across the thoroughfare. It fits comfortably into its urban setting, the segment to the west near the river surrounded by the dense vegetation lining the bank, while the eastern volume abuts onto a densely built quarter of detached family homes.

One of the goals posited for the new campus extension was to further improve the way the whole adidas complex blends with the city by adding a new public access on its eastern side. This requirement led the architects to decide on two new volumes, the Gold Building and the Performance Zone Building, located at opposite ends of a large soccer field close to the residential district.

The competition called by the client was swiftly concluded, with Lever Architecture winning the brief along with the firms Studio O+A and GGN. The budget and delivery date specifications were particularly challenging: adidas required a construction whose architecture reflected its corporate culture and commitment to quality, authenticity and innovation but which had to be completed within 24 months.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
9 (RLIN) 71
Topical term or geographic name entry element ARCHITECTURE GENERAL (AR-GEN)
773 0# - HOST ITEM ENTRY
Place, publisher, and date of publication Bologna, Italy The Plan - Architecture & Technologies in Detail
International Standard Book Number 2499-6602
Title Plan
856 ## - ELECTRONIC LOCATION AND ACCESS
URL https://www.theplan.it/eng/magazine/2022/the-plan-139-06-2022/adidas-east-village-extension
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Articles Abstract Database
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Permanent Location Current Location Shelving location Date acquired Barcode Date last seen Price effective from Koha item type
          Reference School of Architecture School of Architecture Archieval Section 2022-07-20 2022-1193 2022-07-20 2022-07-20 Articles Abstract Database
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha