Adidas east village extension- Team Work
By: Testa, Caterina.
Publisher: Bologna The Plan - Architecture & Technologies in Detail 2022Edition: Issue 139 - June.Description: 78-89p.Subject(s): ARCHITECTURE GENERAL (AR-GEN)Online resources: Click here to access online In: PlanSummary: The North American headquarters of adidas, the multinational sports apparel company, is located north of downtown Portland, Oregon, along the eastern bank of the Willamette River, which flows through the city. Although essentially made up of two sections separated by a busy main road – Greeley Avenue – the campus forms a compact unit, joined by an elevated walkway across the thoroughfare. It fits comfortably into its urban setting, the segment to the west near the river surrounded by the dense vegetation lining the bank, while the eastern volume abuts onto a densely built quarter of detached family homes. One of the goals posited for the new campus extension was to further improve the way the whole adidas complex blends with the city by adding a new public access on its eastern side. This requirement led the architects to decide on two new volumes, the Gold Building and the Performance Zone Building, located at opposite ends of a large soccer field close to the residential district. The competition called by the client was swiftly concluded, with Lever Architecture winning the brief along with the firms Studio O+A and GGN. The budget and delivery date specifications were particularly challenging: adidas required a construction whose architecture reflected its corporate culture and commitment to quality, authenticity and innovation but which had to be completed within 24 months.Item type | Current location | Collection | Call number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
Articles Abstract Database | School of Architecture Archieval Section | Reference | Not for loan | 2022-1193 |
The North American headquarters of adidas, the multinational sports apparel company, is located north of downtown Portland, Oregon, along the eastern bank of the Willamette River, which flows through the city. Although essentially made up of two sections separated by a busy main road – Greeley Avenue – the campus forms a compact unit, joined by an elevated walkway across the thoroughfare. It fits comfortably into its urban setting, the segment to the west near the river surrounded by the dense vegetation lining the bank, while the eastern volume abuts onto a densely built quarter of detached family homes.
One of the goals posited for the new campus extension was to further improve the way the whole adidas complex blends with the city by adding a new public access on its eastern side. This requirement led the architects to decide on two new volumes, the Gold Building and the Performance Zone Building, located at opposite ends of a large soccer field close to the residential district.
The competition called by the client was swiftly concluded, with Lever Architecture winning the brief along with the firms Studio O+A and GGN. The budget and delivery date specifications were particularly challenging: adidas required a construction whose architecture reflected its corporate culture and commitment to quality, authenticity and innovation but which had to be completed within 24 months.
There are no comments for this item.