Construction project scheduling and control (Record no. 5346)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 00802nam a2200205Ia 4500 |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20190503114611.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 181009s9999 xx 000 0 und d |
020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
International Standard Book Number | 9781118846001 |
040 ## - CATALOGING SOURCE | |
Original cataloging agency | AIKTC-KRRC |
Transcribing agency | AIKTC-KRRC |
041 ## - LANGUAGE CODE | |
Language code of text/sound track or separate title | ENG |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | 624.068 |
Item number | MUB |
Edition number | DDC23 |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Mubarak, Saleh |
245 #0 - TITLE STATEMENT | |
Title | Construction project scheduling and control |
250 ## - EDITION STATEMENT | |
Edition statement | 3rd Ed. |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Place of publication, distribution, etc. | New Jersey |
Name of publisher, distributor, etc. | Wiley International |
Date of publication, distribution, etc. | 2015 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xv, 512p. |
Other physical details | | Binding- Hard Bound | |
520 ## - SUMMARY, ETC. | |
Summary, etc. | An efficient, well–thought out, strictly defined schedule that allows for inevitable delays and changes is the crux of a successful construction project. Scheduling encompasses everything from staff requirements and equipment needs to material delivery and inspections, and the effective scheduler must have a deep understanding of the construction process and workflow. Construction Project Scheduling and Control describes the tools, techniques, and practices that make projects run smoothly, with invaluable insight from a construction professional. This new third edition includes information on building information modeling (BIM) and its relationship to project control, and a thorough exploration of the latest developments in the field, including the author′s own Dynamic Minimum Lag technique. Solved and unsolved problems help students apply critical thinking to issues in construction scheduling, providing a real–world glimpse of the realities of this complex function. |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Construction Engineering and Management (CEM) |
9 (RLIN) | 4690 |
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Project Management |
9 (RLIN) | 4699 |
653 ## - INDEX TERM--UNCONTROLLED | |
Uncontrolled term | ARROW NETWORKS |
653 ## - INDEX TERM--UNCONTROLLED | |
Uncontrolled term | BAR CHARTS |
653 ## - INDEX TERM--UNCONTROLLED | |
Uncontrolled term | NODE NETWORKS |
856 ## - ELECTRONIC LOCATION AND ACCESS | |
Uniform Resource Identifier | https://ndl.iitkgp.ac.in/result?q={%22t%22:%22search%22,%22k%22:%22Construction%20management%20%26%20planning%22,%22s%22:[%22DDC=\%22600%3A%3ATechnology\%22%22],%22b%22:{%22filters%22:[]}} |
Public note | Explore NDL MAterial |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Koha item type | Text Books |
Source of classification or shelving scheme |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Permanent Location | Current Location | Shelving location | Date acquired | Source of acquisition | Cost, normal purchase price | Total Checkouts | Full call number | Barcode | Checked out | Date last seen | Date last checked out | Cost, replacement price | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Reference | School of Engineering & Technology (PG) | School of Engineering & Technology | Special Reference (RR) | 2015-08-31 | Medico's Book Aid | 6999.20 | 1 | 624.068 MUB | ME0145 | 2019-08-12 | 2019-07-01 | 2019-07-01 | 8749.00 | 2018-10-09 | Text Books |