Normal view MARC view ISBD view

Construction project scheduling and control

By: Mubarak, Saleh.
Publisher: New Jersey Wiley International 2015Edition: 3rd Ed.Description: xv, 512p. | Binding- Hard Bound |.ISBN: 9781118846001.Subject(s): Construction Engineering and Management (CEM) | Project Management | ARROW NETWORKS | BAR CHARTS | NODE NETWORKSDDC classification: 624.068 Online resources: Explore NDL MAterial Summary: An efficient, well–thought out, strictly defined schedule that allows for inevitable delays and changes is the crux of a successful construction project. Scheduling encompasses everything from staff requirements and equipment needs to material delivery and inspections, and the effective scheduler must have a deep understanding of the construction process and workflow. Construction Project Scheduling and Control describes the tools, techniques, and practices that make projects run smoothly, with invaluable insight from a construction professional. This new third edition includes information on building information modeling (BIM) and its relationship to project control, and a thorough exploration of the latest developments in the field, including the author′s own Dynamic Minimum Lag technique. Solved and unsolved problems help students apply critical thinking to issues in construction scheduling, providing a real–world glimpse of the realities of this complex function.
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Collection Call number Status Date due Barcode Item holds
 Text Books Text Books School of Engineering & Technology
Special Reference (RR)
Reference 624.068 MUB (Browse shelf) Checked out to Umesh V. Jadhav (CEF012) 12/08/2019 ME0145
Total holds: 0

An efficient, well–thought out, strictly defined schedule that allows for inevitable delays and changes is the crux of a successful construction project. Scheduling encompasses everything from staff requirements and equipment needs to material delivery and inspections, and the effective scheduler must have a deep understanding of the construction process and workflow. Construction Project Scheduling and Control describes the tools, techniques, and practices that make projects run smoothly, with invaluable insight from a construction professional.

This new third edition includes information on building information modeling (BIM) and its relationship to project control, and a thorough exploration of the latest developments in the field, including the author′s own Dynamic Minimum Lag technique. Solved and unsolved problems help students apply critical thinking to issues in construction scheduling, providing a real–world glimpse of the realities of this complex function.

There are no comments for this item.

Log in to your account to post a comment.
Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha