Normal view MARC view ISBD view

Cost performance of Public, private Partnership (ppp) road Projects in India

By: Kumar, Modish.
Contributor(s): Kumari, Santosh.
Publisher: Pune NICMAR 2022Edition: Vol, 35(3), Jul, Sep.Description: 13-22p.Subject(s): Civil EngineeringOnline resources: Click here In: NICMAR Journal of construction managementSummary: purpose of this paper is to identify the best public-private partnership (PPP) model in terms of cost performance for road projects out of four variants build- operate-transfer (BOT), build -own-operate-transfer BOOT) and design-build-finance-operate-transfer (DBFOT).the methodology adopted in this paper is an analysis of secondary data on public-private-partnership road projects and testing the hypotheses claim for the difference in cost performance among groups by performing analysis of variance (ANOVA) posthoc test. the study is limited to the four variants of public-private-partnership (ppp) road projects and suggests the best variants out of those four.other parameters of project performance like time, social benefits etc. are not considered in this paper. the paper compares the cost performance of 450 public, private partnership (PPP)road projects categorized based on the ppp model type and size of the project. this paper is an attempt to study the cost parameter of ppp infrastructural road projects in India. the paper investigates how frequent project cost overrun happens in road projects in India and also identifies the best performing public-private-partnership (ppp) for roads
Tags from this library: No tags from this library for this title. Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Status Date due Barcode Item holds
Articles Abstract Database Articles Abstract Database School of Engineering & Technology (PG)
Archieval Section
Not for loan 2023-0113
Total holds: 0

purpose of this paper is to identify the best public-private partnership (PPP) model in terms of cost performance for road projects out of four variants build- operate-transfer (BOT), build -own-operate-transfer BOOT) and design-build-finance-operate-transfer (DBFOT).the methodology adopted in this paper is an analysis of secondary data on public-private-partnership road projects and testing the hypotheses claim for the difference in cost performance among groups by performing analysis of variance (ANOVA) posthoc test. the study is limited to the four variants of public-private-partnership (ppp) road projects and suggests the best variants out of those four.other parameters of project performance like time, social benefits etc. are not considered in this paper. the paper compares the cost performance of 450 public, private partnership (PPP)road projects categorized based on the ppp model type and size of the project. this paper is an attempt to study the cost parameter of ppp infrastructural road projects in India. the paper investigates how frequent project cost overrun happens in road projects in India and also identifies the best performing public-private-partnership (ppp) for roads

There are no comments for this item.

Log in to your account to post a comment.

Click on an image to view it in the image viewer

Unique Visitors hit counter Total Page Views free counter
Implemented and Maintained by AIKTC-KRRC (Central Library).
For any Suggestions/Query Contact to library or Email: librarian@aiktc.ac.in | Ph:+91 22 27481247
Website/OPAC best viewed in Mozilla Browser in 1366X768 Resolution.

Powered by Koha